A turnkey design-and-build water supply project drawing from the Tekeze River in Ethiopia. Delivered for Netafim as part of its wider irrigation development serving 7,000 hectares of sugarcane cultivation. Jhordan Gerber served as Chief Engineer and Project Manager at Baran International.

February 2016 to May 2018US$80 million project64 km of GRP pipelinesApprox. 21,000 m³/hour design flow2 river intakes4 reservoirs6 pumping stations

Client: Netafim   |   End user: Ethiopian Sugar Corporation

Pumping station installation with large pumps, valves and pipework in Ethiopia
Pumping station installation, part of the Tekeze River water supply infrastructure.

Engineering and delivery

The role included coordinating contractors and engineering teams across construction zones and resolving geological challenges affecting execution and delivery schedules.

International project approach

  • Applied accumulated international project experience to local regulations and the equipment required for delivery.
  • Made effective use of local resources and adapted working methods to the country of operation.
  • Developed and implemented supplier evaluation and selection processes.
  • Implemented advanced Israeli technologies in a developing-country setting.
  • Managed risks associated with international operations and a changing geopolitical environment.

On site in Ethiopia

Pumping station installation within the rock excavation in Ethiopia
Pumping station installation within the rock excavation
Reservoir lining works in Ethiopia
Reservoir lining works
Panoramic view of river intake construction and earthworks in Ethiopia
Panoramic view of river intake construction and earthworks
Rock excavation along the pipeline route in Ethiopia
Rock excavation along the pipeline route
Large-diameter pipeline installation in Ethiopia
Large-diameter pipeline installation
Earthmoving works at the river intake in Ethiopia
Earthmoving works at the river intake
Reservoir earthworks and pipework during construction in Ethiopia
Reservoir earthworks and pipework during construction
GRP pipeline storage and site logistics in Ethiopia
GRP pipeline storage and site logistics
Reinforced concrete formwork during construction in Ethiopia
Reinforced concrete formwork during construction

This project represents Jhordan Gerber’s professional experience at Baran International. Photographs document construction and installation stages. Select a photograph to view it at full size.

← All projects

WhatsApp ↗